• Installation of steel structure and equipment related to the expansion of ZMPW Bogdanka S.A.;
  • Modernization of a process line for the production of carbon in the grade Pieklorz along with documentation implementation and commissioning for KW S.A. KWK Piekary;
  • Repair of bucket conveyor B-800 Tech. No. 3608/2 – 1 pc. for ZMPW KWK Murcki-Staszic Ruch Boże Dary;
  • Replacing of a bucket lift in the Department of Enrichment and Desulphurization of Power Materials in KW S.A. Branch Coal Mine Boleslaw Śmiały;
  • Repair of drainage lift at the station No. 80 mounted in ZPMW KHW KWK Murcki-Staszic Ruch Staszic;
  • Repair of a dense media separator DIS.A. 1S-2000BP in motion ZPMW;
  • Repair of a dense media separator DIS.A. 3S-3000 in motion ZPMW;
  • Installation and commissioning in ZPMW KHW S.A. KWK Murcki-Staszic Ruch- Staszic a primary crushers type KWK-100U;
  • Replacing of a bearing of shaft mine hoist rope in the eastern shaft Piotr in KHW KWK Mysłowice-Wesoła;
  • Repair of a chute from PWK1-2 type vibrating screening machine, 6×5,25 on belt conveyor mounted in ZPMW KHW S.A. KWK Murcki-Staszic Ruch – Staszic;
  • Implementation and design of sludge transport process line in ZPMW KHW KWK “Murcki-Staszic” Ruch “Staszic”;
  • Execution of repair works for the task: Repair of transport process line involving the repair of supporting structure and replacing the transport-drainage lift B=800 in ZG Sobieski;
  • Delivery of steel pipes, clamps, fasteners, steel and screw ones (Beginning of Periodical Technical Maintenance and start-up operations) on ZPMW Bogdanka S.A.;
  • Repair of floatation waste water pipeline Ø 400 in fine coal washer building in KHW KWK Murcki-Staszic Ruch Boże Dary;
  • Replacement of 6300mm rope pulley on the tower shaft and KW S.A. KWK Piast;
  • Modernization of tower shaft V shaft in KHW S.A. KWK “Murcki-Staszic” Ruch Staszic;
  • Implementation of repair works of tower shaft “Barbara” in the S.A.lt Mine Kłodawa S.A.;
  • Implementation of repair works of tower shaft “Michał” in the S.A.lt Mine Kłodawa S.A.;
  • Implementation of soundproof – insulating housing of stone dump stations 940A / 940g, together with supplementation of missing pieces of the station housing 940g / 941 and platform walls 950A and the area of 940E1 catcher in KHW S.A. KWK Wujek Ruch Wujek;
  • Repair of lift shaft – Replacing the upper pulley on the tower shaft of mine shaft hoist in “Szewczyk” shaft for KW S.A. Department KWK Ziemowit;
  • Execution of repair works on Barbara KS Kłodawa shaft;
  • Installation of pipelines, circumference 47.1 – LW Bogdanka S.A.;
  • Installation of devices, circumference 106.1 on Bogdanka S.A.;
  • Repair of a chute from PWK1-2 type vibrating screening machine, 6×5,25 on belt conveyor mounted in ZPMW KHW S.A. KWK Murcki-Staszic Ruch – Staszic;
  • Processing of D13 node in the object No. 47.1 ZPMW Bogdanka S.A.;
  • Levels modernization of working air connections development to a jig – Bogdanka S.A.;
  • Reconstruction of DN200 steel pipeline in a facility No. 47.1 in ZPMW Bogdanka
  • Implementation works for technological start of circumference 47.1 and 106.1 in Bogdanka S.A.;
  • Design, assembly and supply of steel demag beams in circumference 103.1 / 106.1 ZPMW Bogdanka S.A.;
  • Implementation of compressed air installation into to a tank of 2,5m3 11 bars as shown in figure – LW Bogdanka S.A.;
  • Execution of repair works Michal shaft KS Kłodawa S.A.;
  • Reconstruction of transfer pipelines from D13 sump, from hydro – classifier – ZPMW Bogdanka S.A.;
  • Implementation of repair works on protection walls in KS Kłodawa Barbara shaft – in accordance with Annex TZP-86-2014 S.A.;
  • Assembling and welding works – BGH Eintracht (Germany)
  • Assembling and welding works – Constellium (Germany).